Projects
| S/N | Client | Year | Project | Scope Details |
|---|---|---|---|---|
| 71 | Toyota TC/ Toshiba TPSC. | 2010 2012 |
El Atf and Sidi Krir Simple Cycle Power Plants, each -750 MW. | Warranty Representation and Related Services. |
| 70 | ABB Mannheim. | 2011 | Al-Solaimanyah power plant 2x125MW -Iraq. | Construction Supervision. |
| 69 | SOCOIN | 2010 2011 |
Dir Ali II 1x750MN CCPP-Syria. | Consultancy services. |
| 68 | ABB Mannheim | 2010 2011 |
Dohuk 4x125MW SCPP plant -Iraq. | Seconding of Commissioning Manager. |
| 67 | HYOSUNG CORPORATION. | 2011 | Damietta-4x125MW SCPP, 220KV GIS Power Station Project in Egypt. | Damietta 220KV GIS Substation Project by providing Relays Setting Calculations Report. |
| 66 | VECG | 2011 | El-Haram Power generation Plant El Madeinah El Monawara. | Mechanical systems shop drawings. |
| 65 | ECG | 2011 | Damietta-4x125MW SCPP Elshabab-8x125MW SCPP. |
O&M Manual preparation. |
| 64 | Kharafi National. | 2011 | Damietta- 4x125MW SCPP Elshabab- 8x125MW SCPP. |
For Firefighting, water systems and fuel oil system:
|
| 63 | VERINNO | 2010 | Mohandseen Showroom. | Electrical power distribution system study. |
| 62 | Electro Tharwat | 2010 | Al-Gabal Al- Asfar, Cairo-Alex & EL-Haramain railways projects |
Tender document study and determination of BOQ. |
| 61 | NEM Netherlands. | 2010 | Sidi Krir and El Atf Combined Cycle Power Plant -750 MW each. | HRSG systems Commissioning. |
| 60 | Saudi Government | 2010 | Motabaqah Dammam Laboratory Complex. | HVAC, fire fighting, plumbing and lab gases systems design. |
| 59 | Benha University. | 2010 | Benha Conjunctivitis Hospital. | HVAC system design. |
| 58 | The Ministry of Education-SA. | 2010 | Schools Complex. | HVAC system design. |
| 57 | The Ministry of Education-SA. | 2010 | Scientific Center. | HVAC system design. |
| 56 | Foundation of Youth Care-SA. | 2009 | Youth Center-Goof. | HVAC system design. |
| 55 | Saeed Basameh | 2009 | Basameeh office building. | HVAC system design. |
| 54 | Rajhee | 2009 | Rajhee Tower | HVAC system design |
| 53 | Hammad El Mousa | 2009 | Mousa (2) Tower | HVAC system design |
| 52 | Nabhanya Municipality | 2009 | Nabhanya Municipality | HVAC system design |
| 51 | Hammad El Mousa | 2009 | Mousa (1) Tower | HVAC system design |
| 50 | Muhammed Abdullah Al-Othman. | 2009 | Othman Towers- Al Khobar. | HVAC, fire fighting and plumbing systems design. |
| 49 | Egyptian Canadian Pharmaceuticals ECAN Pharmaceuticals | 2009 2010 |
With: Egypt. Comp. for Complementary Works ECC Facility – El Obour City, Cairo, Egypt. | Preparation of Electrical, Fire Fighting and plumbing systems Contractor Package. |
| 48 | Middle Delta & West Delta Electricity Production Company. | 2009 | Mitsubishi Electric Co. (MELCO) Sidi Krir and El Atf Combined Cycle Power Plant -750 MW each. |
Long Term Service Agreement for Commissioning Support and start up activity. |
| 47 | Middle Delta & West Delta Electricity Production Company. | 2009 | Toyota TC/ Toshiba PSC. | Preparation of Chemical cleaning procedure. Sidi Krir and El Atf SCPP 750 MW each. |
| 46 | AIR LIQUIDE | 2009 | Gases Production Plant at the 6th of October City. | Design Cooling System Logic Diagrams. |
| 45 | Toyota TC/ Toshiba TPSC. | 2009 2010 |
El Atf Simple Cycle Power Plant -750 MW. | Lump Sum Contract Commissioning of the Electrical and Mechanical BOP (CP-117 and CP-118). |
| 44 | Toyota TC/ Toshiba TPSC. | 2009 2010 |
Sidi Krir Simple Cycle Power Plant -750 MW. | Assist in the commissioning of Mechanical BOP (CP-118). |
| 43 | VATECH HYDRO | 2009 | Esna Barrage and Hydro Power generation plant. | Owner Training on protection test equipment. |
| 42 | ABB Mannheim | 2009 | QATALUM Combined Cycle Power Plant. | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Commissioning and Project Controls Support. |
| 41 | ELMACO | 2009 | PGESCo Design for New Transformer Factory – Badr City. | Steel Structure Design as a sub-consultant to PGESCo. |
| 40 | AUG Pharmaceuticals | 2008 | AUG Pharmaceuticals Facility – 6th of October City, Cairo, Egypt. | Preparation of Electrical, Fire Fighting and plumbing systems Contractor Package. |
| 39 | Global Partners – INITEC. | 2008 | El-Kuraimat (III) Power Plant Project CP-105 & CP-106 Scope, El-Tebbin Power Plant Project CP-106 & CP-118 Scope Nubaria (III) Power Plant Project CP-106, CP-117 & CP-118 Scope | Grounding System Design and BOQ within INITEC scope of supply. |
| 38 | Power Generation Engineering and Services Company (PGESCo). | 2008 | PGESCo building at New Cairo - 3 floors extension. | Consultation Services - Electromechanical Contractor Package preparation. |
| 37 | ABB Manheim | 2007 2008 |
Abu Fontas Power Plant Project (QEWC)-Qatar. | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Protection and Control Systems Installations, commissioning and startup services. |
| 36 | ABB Manheim | 2007 2008 |
Benghazi 319 pumping station. | Electrical (LV & MV SWGR, Power Transformers, HV cables, Generator Circuit Breaker, and DC systems), Protection and Control Systems installations, commissioning and startup services. |
| 35 | GlaxoSmithKline | 2007 | Compressors station upgrade Egypt – Madinet El Salam Manufacturing Facility. | Supply, Installations and commissioning for Upgraded Station Electrical and Control System. |
| 34 | Shell Oil – through United Engineering Co. | 2007 | Rehabilitation of Light Fuel oil Pumping station. Mostorod facility – Cairo. | Mechanical, Electrical, Protection and Control Systems Installations, commissioning and startup services. |
| 33 | GlaxoSmithKline | 2005 2006 |
Egypt – Madinet El Salam Manufacturing Facility. | Consultation Services for Survey for Factory Electrical System as built drawings preparation. |
| 32 | Egypt Ministry of Irrigation and Water Resources. | 2005 | El Farma water pumping station. | Control System analysis and troubleshooting. Resolution system problems. |
| 31 | CONTRACK International Inc. | 2004 | U.S. Brigade Compound Kabul Military Training Facilities, Kabul, Afghanistan. | Full Engineering and Coordination with CONTRACK engineering and its system sub-suppliers for the Power Plant Fuel Oil System control system and piping. |
| 30 | GlaxoSmithKline | 2004 | Survey of internal control panel wiring. | Old Low Voltage Substation Survey of internal control wiring and issue wiring AS BUILT. |
| 29 | Oman Water Authority. | 2004 | FAHOUd RO water Treatment. | Preparation of PLC specification, logic diagrams and plant operation description. |
| 28 | Global Partners / Cegelec France. | 2004 | El-Gabal El Asfar Waste Water Treatment Project Cegelec scope of work through “Global Partners”. | Electrical Start-up and Commissioning. |
| 27 | ALSTOM Power Inc. | 2001 2003 |
Aswan High Dam Control System Upgrade – By ALSTOM Power Inc. | Commissioning and start- up of Aswan High dam new DCS system. |
| 26 | “ALSTOM Power”. | 2001 2003 |
Aswan High Dam Control System Upgrade – By ALSTOM Power Inc. | Quality Assurance / Quality Control For project. |
| 25 | US Filters “Domtty Factory” “Tanta for Oil and Soap Factory” “Bisco Misr Cairo” “Bisco Misr Alex” |
2001 2002 |
Industrial Waste Treatment Plant. | Complete Electrical Installations. |
| 24 | US Filters “Four Seasons Hotel – Sharm El Sheikh”. | 2001 | Reverse Osmoses, Deep well pumps and Sewage Treatment Plant. | Complete Electrical Installations. |
| 23 | US Filters “Marsa Alam Development” | 2001 | Deep wells raw water Pumps sys. Feed RO plant | Electrical and Control System Design. |
| 22 | US Filters “Egyptian European Pharmaceutical Co.”. | 2001 | Water Treatment Plant. | Piping And Isometric Design. |
| 21 | Hi-Tec Pioneers “Egyptian Ministry Of Irrigation and Water Resources”. | 2000 2002 |
Bahr Tanah (Mansoura) Irrigation System levels control. | Control system design. |
| 20 | Hi-Tec Pioneers Multinational Forces Observers. | 2000 | Waste Water De-watering System. | Control system design, FAT of PLC and site commissioning. |
| 19 | Ministry of Electricity –New & Renewable Energy Authority. | 2000 | Experimental 15kW Wind Turbine Generation Unit. | Control system design. |
| 18 | US Filters “Hosny Factory”. | 2000 | Industrial Waste treatment Plant. | Complete Plant Electrical & instr. Installations. |
| 17 | US Filters “Aswan Governorate”. | 2000 | Aswan Water Treatment Plant. | Mechanical and Piping Isometrics Design. |
| 16 | US Filters “Tanta Governorate“. | 2000 | Industrial Waste treatment Plant. | Mechanical and Piping Isometrics Design. |
| 15 | US Filters “Alexandria Oil Company”. | 2000 | Oil Blending Plant. | Preparation of Cables Bill Of Quantities for units 1&2. |
| 14 | US Filters “El Malha Development”. | 2000 | RO units and Sewage Treatment Unit. | Electrical and instrumentation installations. |
| 13 | Qarun Petroleum Co. | 2000 | Oil Receiving Station. | P &I Diagrams Drawings. |
| 12 | US Filters “Ghazala Village”. | 1999 | Water treatment plant. |
|
| 11 | US Filters “West Suhag City”. | 1999 | Chlorination Plant | Main Electrical and Control Panel design. |
| 10 | US Filters “El-Nour We El-Iman Village – Arish”. | 1999 | Residential Area Infra Structure. | Outdoor electrical, water and sewage facilities design. |
| 9 | US Filters “ABB SUSA”. | 1998 | Sewage Treatment Plant. | Main Electrical and Control Panel design. |
| 8 | US Filters “PETROJET” | 1998 | Sewage treatment plant. | Main Electrical and Control Panel design. |
| 7 | US Filters “Caribbean Beach Resort“. | 1998 | Sewage treatment plant. | Main Electrical and Control Panel design. |
| 6 | US Filters “Shebin El Kom Hospital“. | 1998 | Sewage Treatment Plant. | Main Electrical and Control Panel design. |
| 5 | US Filters “ENPPI”. | 1998 | Chlorination Plant. | Main Electrical and Control Panel design. |
| 4 | US Filters “Reef Oasis Resort“ | 1998 | Sewage Treatment Plant | Main Electrical and Control Panel design. |
| 3 | US Filters “Sun Flowers Resort Project” | 1998 | Sewage Treatment Plant | Main Electrical and Control Panel design. |
| 2 | US Filters “Mirage Resort Project” | 1998 | Sewage Treatment Plant | Main Electrical and Control Panel design |
| 1 | US Filters “Dream Land Project” | 1998 | Sewage Treatment Plant |
|