Preparation of Engineering Documentation
Preparation of Engineering Documentation:
- Qarun Petroleum Co. , Preparation of P&I Diagrams For the Oil Receiving Station – 2000.
- Alexandria Oil Co. , Preparation of Cables BOQ for units 1&2 of the Oil Blending Plant - 2000.
- Tanta Governorate , Industrial Waste Treatment Plant - Mechanical and Piping Isometrics Diagrams for the Plant - 2000.
- Aswan Governorate , Aswan Water Treatment Plant - Mechanical and Piping Isometrics Diagrams for the Plant - 2000.
- Egyptian European Pharmaceutical Co.,Water Treatment Plant - Mechanical and Piping Isometrics Diagrams for the Plant - 2001.
- Ministry of Electricity , New & Renewable Energy Authority, The control system design for the experimental 15kW wind turbine generation unit – 2000.
- GlaxoSmithKline , Preparation of O&M manual for LV distribution load center within “Glaxo Factory”.- 2004.
- PGESCo building at New Cairo - 3 floors extension – Preparation of Electromechanical Contractor Package - 2008 .
- Global Partners – INITEC, Grounding System Design and BOQ within INITEC scope of supply- 2008:
- El-Kuraimat (III) Power Plant Project CP-105 & CP-106 Scope,
- El-Tebin Power Plant Project CP-106 & CP-118 Scope
- Nubaria (III) Power Plant Project CP-106, CP-117 & CP-118 Scope
- AUG Pharmaceuticals – Preparation of Electrical and plumbing systems Contractor Package - 2008-2009