Large Scale Projects
| Project Owner | Client | Project | Year | Awarded Scope |
|---|---|---|---|---|
| Hydro Power Generation Company (HPGC)- Egypt | Alstom Power Inc. | Up-grading of control & Protection System | 2001:2003 |
-Project Quality Assurance / Quality Control. -Commissioning and start- up of Aswan High Dam new DCS system. |
| Greater Cairo Waste Water Authority (GCWWA )- Egypt | Global Partners - Egypt / Cegelec - France | Gabal El Asfar Waste Water Treatment Project - Phase II | 2004 | Commissioning and start- up of the plant electrical system. |
| U.S. Brigade Compound, Kabul Military Training | Facilities ,Afghanistan | Facility's Power Plant fuel system | 2004 |
-Preparation of detailed engineering. -Project coordination between different suppliers and contractors. -Issue final control system cabling and termination drawings and documents for the project. -Supply of all field Instruments and valves for fuel loading and storage system. -Supply the PLC field interface Panel. -Supervise the installation & commissioning. |
| Qatar Electricity and Water Company | ABB AG - Manheim, and ABB Ch | RAS ABU FONTAS B2 Power and Desalination plant, Qatar | 2007-2008 | Through manpower seconded engineers we perform: -Installation supervision and client handing over -Commissioning and start-up of the Plant Electrical Aystem. -Site management support. -Client training. |
| Qatar Aluminum | ABB AG - Manheim | Qatalum Combined Cycle Power Plant (1350 MW), Qatar | 2009 | Through manpower seconded engineers we perform: -Commissioning and start-up of the Plant Electrical Aystem. -Project Controls support (Cost Schedule and ProCosys). -Site management support. |
| Middle Delta Electricity Production Company | Toyota Tsusho – Toshiba Plant Sys. and Serv. Co. (CP-117 & CP-118) | El Atf Combined Cycle Power Plant (750 MW) | 2009 | Through Lump Sum Scope, we performed: -BOP equipment and systems testing and commissioning for Simple Cycle operation. -Instrumentation Calibration for Simple Cycle. -Equipment Operation for Simple Cycle. |
| West Delta Electricity Production Company | Toyota Tsusho – Toshiba Plant Sys. and Serv. Co. (CP-118) | Sidi Krir Combined Cycle Power Plant (750 MW) | 2009 | Through Lump Sum Scope, we performed: -Support Commissioning Management for CP-118 Simple Cycle operation. |